Find Contractors

S. Florida S.W. Florida C. Florida N.E. Florida N.W. Florida 🗺️ Contractor Map

For License Holders

Update Public Record Resources

Company

About FAQ Contact Sign In
Update Record
Call Charlie
Is this your public record? This profile was compiled from DBPR public records. Verify and update your information.
Update Public Record
CP

CRITICAL PATH CONSTRUCTION LLC

general contractor Riviera Beach, FL CGC1519159
You're about to Call Charlie — directory assistance for Florida's licensed contractors.
Last verified against DBPR public records: February 2026
35
P.R.S
C
FL License
2026-08-31
Expires
Florida DBPR Verification Database
DBPR
DBPR Licensed
1 Platform
Riviera Beach, FL
Here's what Florida says about this contractor. We just made it readable. Want to talk to them? Call Charlie.
Public Record · Florida Statute 119

Florida State License DBPR Verified

State Licensed & Verified Verified through the Florida Department of Business & Professional Regulation
CGC1519159
general contractor
CRITICAL PATH CONSTRUCTION LLC
2010-11-05
2026-08-31
C

Public Record Score

35/100

Weak Public Record

Minimal online presence. License on file but few other signals.

Weak Tier
DBPR License +30
Google Business +15
Website +10
Phone Verified +10
Business Address +5
Reviews (10+) +10
Citations (0 platforms) +0
Found on 1 of 19 platforms

About General Contractors in Florida

General contractors in Florida are strictly required to hold an active CGC (Certified General Contractor) or CRC (Certified Residential Contractor) license issued by the Department of Business and Professional Regulation (DBPR) under Florida Statutes Chapter 489. A CGC license authorizes work on any structure — commercial, residential, or industrial — without limitation. CRC licensees are limited to residential projects of 3 stories or fewer.

General contractors in Riviera Beach coordinate all phases of construction including permitting, scheduling subcontractors, materials procurement, and code compliance inspections. All work must meet the Florida Building Code — one of the most stringent in the nation due to hurricane and flood requirements.

The Associated General Contractors of Florida (AGC) and the National Association of Home Builders (NAHB) set professional standards for the industry. Florida law requires general contractors to carry liability insurance, workers' compensation coverage, and maintain a surety bond or cash deposit.

Please verify your contractor's license before hiring. Search any Florida contractor license at myfloridalicense.com or use Call Charlie's instant verification. The FTC's guide to hiring a contractor is a helpful resource for homeowners.

Verified by Florida DBPR

CRITICAL PATH CONSTRUCTION LLC — License #CGC1519159. Public record. State verified. Need to reach them?

DBPR CGC1519159 Riviera Beach, FL Public Record

Is This Your Public Record?

This profile was compiled from DBPR public records and verified against the state database. If you are the license holder, update your record to ensure consumers in Riviera Beach have your most accurate contact information and credentials.

Update Public Record
DBPR Verified Public Record Updated February 2026 License Holder Editable
Call Charlie Directory Assistance Update Record

Frequently Asked Questions

Is CRITICAL PATH CONSTRUCTION LLC a licensed general contractor in Florida?
Yes. CRITICAL PATH CONSTRUCTION LLC holds an active Florida General Contractor license (#CGC1519159) issued by the Department of Business and Professional Regulation (DBPR). You can verify this license directly at myfloridalicense.com or through Call Charlie's instant verification system.
What is CRITICAL PATH CONSTRUCTION LLC's Public Record Score?
CRITICAL PATH CONSTRUCTION LLC has a Public Record Score of 35/100, rated Weak. This score is calculated from publicly available data including DBPR license status, Google Business Profile presence, verified phone and address, online reviews, and citation platforms. Higher scores indicate greater public record transparency.
What areas does CRITICAL PATH CONSTRUCTION LLC serve in S. Florida?
CRITICAL PATH CONSTRUCTION LLC is based in Riviera Beach, Florida and serves the S. Florida region. Nearby service areas may include Aventura, Bal Harbour, Bay Harbor Islands, Belle Glade. Contact the contractor directly to confirm their specific service area and availability for your project.
How do I verify CRITICAL PATH CONSTRUCTION LLC's contractor license?
You can verify CRITICAL PATH CONSTRUCTION LLC's DBPR license (#CGC1519159) three ways: (1) Search at myfloridalicense.com — the official Florida DBPR portal, (2) Use Call Charlie's instant verification on this page, or (3) Call the DBPR directly at (850) 487-1395. All Florida contractor licenses are public records under Florida Statute §119.01.
How do I file a complaint against CRITICAL PATH CONSTRUCTION LLC?
To file a complaint against any licensed Florida contractor, visit the DBPR complaint portal or call (850) 487-1395. You can also report unlicensed activity. Florida law protects consumers through the Construction Industry Licensing Board (CILB), which can impose fines, suspend, or revoke contractor licenses.
When was CRITICAL PATH CONSTRUCTION LLC's license issued and when does it expire?
CRITICAL PATH CONSTRUCTION LLC's Florida General Contractor license (#CGC1519159) was issued on 2010-11-05 and is valid through 2026-08-31. License renewal is required by the DBPR before expiration. You can check the current status anytime at myfloridalicense.com.
What should I check before hiring a general contractor in Riviera Beach?
Before hiring any general contractor in Riviera Beach, Florida, verify: (1) Active DBPR license at myfloridalicense.com, (2) Insurance and bonding, (3) Complaint history with the DBPR, (4) Online reviews and Public Record Score on Call Charlie, (5) Written estimate and contract scope. Florida law (Chapter 489, F.S.) requires all contractors to be licensed for work over $1,000.

Are you a licensed general contractor in Riviera Beach?

Update your public record to ensure consumers have your most accurate 2025 credentials and contact information.

Update Public Record (Free)